In a tight kitchen, the floor plan is a budget measured in feet. Every foot given to a walkway, a doorway, or a wasted step is a foot that can’t be used for cooking, prep, or storage.
Cuyler Lewis, one of HRI’s kitchen designers, walks through two real design moves that gave space back and cut plating time down — and what they have in common.

Every foot matters when you’re designing for better kitchen flow.
| Plating Time | Result |
|---|---|
| Before the redesign | 25–28 minutes |
| After the redesign | 10–12 minutes |
Q01What is a pass-through in a commercial kitchen?
An opening or counter where finished plates move from the kitchen to the servers, without staff needing to walk in and out of the cooking area to collect them.
Q02How much space can a smarter pass-through layout save?
It depends on the room, but in this design, integrating the pass-through into the server pickup point saved an additional 3 feet — a meaningful amount in a tight kitchen.
Q03Why does layout affect how long plating takes?
Every extra step between the cold station, the hot station, and the plating area adds time to every single plate. Shortening that path — by placing stations where the chefs actually need them — is often faster than adding more staff or equipment.
Let us guide you through our HRI packages and options in a 15-minute session to assist you in finding the perfect package. For a side-by-side package comparison, please refer to this link.
No problem! Upgrading to a higher-tier package is easy, and any payments made will be credited towards the upgrade.
Your journey begins with a 30-60 minute initial meeting led by your assigned Chef Designer. This session is dedicated to understanding your vision and needs, translating them into an initial design. Following this, we’ll reconvene for a real-time collaboration session to refine the design. Based on your chosen package, you’ll have two to three meetings to review and finalize the design. For more details on what each package includes, click here.
Our design timelines vary, with some packages being completed in just 2-4 weeks. Your Chef will keep you informed about the expected timelines and next steps during each meeting.
Communication is through email and text, with the Design Kick-Off and subsequent meetings held over Zoom. This allows for real-time collaboration and adjustments. All designs will be sent to you in PDF format via email.
We aim to design spaces that efficiently fulfill your vision. If you wish to incorporate existing equipment, please bring the necessary details to the initial meeting.
You have the option to buy the required equipment through HRI. After finalizing your design, HRI will provide a comprehensive equipment quote.
Please note, the materials we provide are intended for conceptual and layout purposes only and are not suitable for permits or health inspections, which require documents from licensed professionals.
The documents we provide serve for conceptualization and layout planning only. Any required construction documents must be obtained from professional construction services.
Even if you’re not ready to begin construction, we’re here to help. Our initial discussions will help us tailor our design services to your project’s specific needs.
For additional requirements, we offer a range of services for an extra charge. Discuss these options with your designer.
Yes! We’ve partnered with FS Foodservice Solutions to make financing your equipment simple and affordable. Whether you’re purchasing a single piece or building out a full kitchen, FS offers flexible programs with quick approvals, competitive terms, and the ability to include soft costs like installation or freight. Financing is available for both new and used equipment, starting at just $500 with no maximum limit. Click here to explore your financing options and to get a free quote.